Fuel thermal power P(n) = 5000 kW
Projected life at full load t(a) = 5500 h / yearHeat to Electricity breakup:
Electrical power (generator terminal power) P(el) = 750 kW
Electrical energy / year W(el) = 750 kW x 5500 hours = 4.125 million kWh
Nominal heat power P(w) = 4200 kW
Heat energy / year W(w) = 4200 x 5500 kW h = 23.1 million kWhThe plant uses untreated wood to fuel a 5 MW high pressure boiler plant with flue gas cleaning filters. The generated high vapor pressure (28 bar nominal pressure) of the boiler system is used to supply a 820 kW steam turbine. The exhaust steam from the turbine is converted into hot water in the heating condenser.
The plant is run on a 24 hr. basis. The generated energy is fed into the grid.