3 x Solar PV Plants [Project #7]

[PLEASE CONTACT US FOR FURTHER INFORMATION]

  • Factory 1

    • 500 MW Wafer Fab

    • Crucible Coating

    • Crystallisation & Melting Furnace ALD

    • Band Saws MB => Ingot to Block

    • Block Centres

    • Wire Saws HCT => Block to Wafer

    • Singulation

    • Inspection

    • Sorter / Packaging

  • Factory 2

    • 275MW Wafer Fab

    • Crucible Coating

    • Crystallisation & Melting Furnace ALD, GT

    • Band Saws MB => Ingot to Block

    • Block Centres

    • Wire Saws HCT => Block to Wafer

    • Singulation

    • Inspection

    • Sorter /Packaging

  • Factory 3

    • 200MW Solar Cell Fab

    • Loading SCHMID

    • Wetbench 1 SCHMID

    • Doper SCHMID

    • Diffusion Furnace Sierra therm

    • Wetbench 2 SCHMID

    • Silicon Nitride ROTH & RAU

    • Screen Print ASYS, FF ST

    • Inspection SCHMID

.

 

 

 
26949 Chagrin Blvd., Ste 304, Beachwood, OH 44122
Phone: +1 (888) 244-5820, Fax: +1 (888) 244-5820